Tool Life, Wear and Cutting Economics

Taylor tool life, how speed shortens life, the cost-per-part and production-rate speeds, and when to change an edge.

Taylor’s tool-life equation

The tool life T is the time a tool cuts before it wears to a set limit (a flank wear land of 0.3 mm is the usual criterion). F. W. Taylor found in 1907 that life falls steeply as cutting speed rises, in a simple power law.

V × Tn = C

Tool life collapses as speed rises01002003004000306090120cutting speed (m/min)tool life (min)HSS (n = 0.125)Carbide (n = 0.25)Ceramic (n = 0.5)V T^n = C with C = 50, 334 and 1 900 m/min (speed for one minute of life): typical for steel, illustrative.
Tool life against cutting speed for HSS, carbide and ceramic tools in steel.
Tool materialn (typical)C (V for T = 1 min)V for 60 minV for 15 min
HSS0.12550 m/min30 m/min36 m/min
Carbide0.250334 m/min120 m/min170 m/min
Ceramic0.5001 900 m/min245 m/min491 m/min

The constants depend on the workpiece, the cut and the tool; the table is typical for plain steel. Use your own wear measurements where you can.

What speed does to tool life

Worked example: a 20 % speed increase

  • T = (C ÷ V)1/n. For carbide (C = 334, n = 0.25) at 150 m/min: T = (334 ÷ 150)4 = 25 min. At 180 m/min (20 % faster) the life is only 12 min: 52 % shorter.
  • The factor for a speed increase of 20 % is 1.2−1/n: 0.23 for HSS (n = 0.125), 0.48 for carbide and 0.69 for ceramic. The more sensitive the tool, the more a small speed change matters: HSS loses 77 % of its life.
  • Slowing down pays the other way: 20 % slower multiplies carbide life by 2.4.
  • For a 20 min life, carbide needs a speed of 334 ÷ 200.25 = 158 m/min.
  • Speed is the most expensive way to remove more metal. Doubling the feed (with a feed exponent of 0.5) cuts life by 4.0 times, doubling the speed by 16 times: for the same removal rate, raise the depth and the feed before the speed.

Tool wear and how to read it

WearCauseTypical situationRemedy
Flank wearAbrasion on the clearance face behind the edgeGradual; sets the tool life (VB = 0.3 mm in ISO 3685)Lower the speed, use a harder grade or coating
Crater wearDiffusion where the hot chip slides on the rake faceSteel with carbide at high speedLower the speed, use a coated or ceramic grade, coolant
Built-up edgeWork material welds to the edgeLow speed in soft or gummy metalRaise the speed, sharper tool, lubrication
Chipping and fractureMechanical shock, thermal cracksInterrupted cuts, too high a feedLower the feed, tougher grade, rounded edge, ramp in
Notch wearHardened skin or scale at the depth-of-cut lineCastings, forgings, work-hardened surfacesVary the depth of cut, cut below the skin
Thermal cracksRepeated heating and cooling in millingFlood coolant on interrupted cutsUse dry cutting or mist with carbide in milling
  • Look at the edge under a magnifier at the end of a run: the wear pattern tells you which parameter to change.
  • Flank wear that is even and slow is normal; fast flank wear means too high a speed. Chipping means the feed or the shock is too high.
  • Change an edge before it fails: a worn tool makes heat and force, and takes the workpiece with it.

Cutting economics: the cheapest speed

A faster cut shortens the time per part but uses up tools sooner. The cost per part has two parts that pull in opposite directions, so it has a minimum. For a machine rate Cm ($ per minute), a tool-change time tc and a cost Ct per edge, the cost per part is

cost per part = Cm (tm + th) + (Cm tc + Ct) × tm ÷ T

Teconomic = (1 ÷ n − 1) × (tc + Ct ÷ Cm)    Tmax production = (1 ÷ n − 1) × tc

The cheapest speed is below the fastest speed01002003004000.01.53.04.56.0cutting speed (m/min)cost per part ($)minimum cost: 187 m/minmaximum production: 304 m/min
Cost per part against cutting speed: a minimum below the maximum-production speed.

Worked example: turning a 50 mm bar, 100 mm long

  • Machine rate Cm = $1.00/min ($60/h), handling th = 2 min, edge change tc = 1 min, edge cost Ct = $6.00, carbide with C = 400 and n = 0.25. The cut time is tm = π × 50 × 100 ÷ (1 000 × V × 0.25 mm/rev) = 62.8 ÷ V minutes.
  • Economic tool life: T = (1 ÷ 0.25 − 1) × (1 + 6.00 ÷ 1.00) = 21 min, which means a speed of V = 400 ÷ 210.25 = 187 m/min and a cost of $2.45 per part (62 parts per edge).
  • Maximum production rate: T = (1 ÷ 0.25 − 1) × 1 = 3 min, at 304 m/min: 26.4 parts an hour against 25.5 (3 % more) at the economic speed, but a cost of $2.69 per part, 9 % higher; only 15 parts per edge.
  • Too slow or too fast both cost: at 120 m/min the cost is $2.55 and at 400 m/min $3.26 per part. Over 5 000 parts a month the economic speed saves $1 203 against the maximum-production speed.
  • Choose the economic speed in general; use the faster speed only when the machine is the bottleneck of the whole shop and the order must ship.

When to change the tool

  • By count: change after a fixed number of parts (62 in the example) with a safety margin, the simplest and most reliable method.
  • By measurement: flank wear of 0.3 mm for finishing and 0.6 mm for roughing, or a change in size, finish, noise or spindle load.
  • By time: a cutting-time counter on the control stops the cycle at the set life.
  • Index, not discard: inserts have several edges: log which one is in use.
  • Never wait for a tool to break when it ruins the part: the tool is the cheapest component of the job.

Troubleshooting

SymptomLikely causeTry
Tool life far shorter than the chart saysSpeed too high, no coolant, wrong grade, rubbingLower the speed 15 to 20 %; check the chip load; use the right grade
Finish gets worse over a runFlank wear growingChange the edge at the preset count
Edges fail at randomChipping from shock or a bad setupCheck runout, rigidity and the entry; lower the feed
Slowing down does not helpRubbing: the feed is too lowRaise the chip load
Cost per part is highToo slow or too fastFind the economic speed from the Taylor constants
Parts size driftsTool wearOffset the tool or shorten the edge life

Related

FAQ

What is Taylor’s equation?

V T^n = C: cutting speed times tool life to a power n is a constant. A small rise in speed shortens life a great deal: about 50 % for a 20 % rise with carbide.

What is the best cutting speed?

Not the highest: the economic speed minimizes the cost per part, which corresponds to a tool life of about 15 to 60 minutes for carbide. Use the maximum-production speed only when output is critical.

How do I find n and C for my tool?

Cut with two or three speeds, measure the time to reach 0.3 mm of flank wear, and fit a straight line on log-log paper: the slope is −n.

Is it better to raise the speed or the feed?

For the same removal rate, raise the depth and the feed first; speed has the biggest effect on life.

References

  • Taylor, F. W., On the Art of Cutting Metals, Transactions of the ASME 28 (1907); ISO 3685, Tool-life testing with single-point turning tools.
  • Kalpakjian, S. and Schmid, S., Manufacturing Engineering and Technology (tool life and economics).
  • Boothroyd, G. and Knight, W. A., Fundamentals of Machining and Machine Tools, CRC Press (economics of machining).

Last reviewed: October 2026. The Taylor constants are typical for steel: measure your own for important jobs.