Sourcing, Services and Outsourcing

Making in-house or buying a service, equipment payback, requesting quotes and protecting your design.

Make it yourself or buy the service?

Almost every prototype uses a mixture: you make the quick, cheap parts yourself and buy the ones that need a machine you do not have, or a skill you do not have. The decision depends on how often you need the process, how fast you need the result and what your time is worth.

FactorFavors making it yourselfFavors buying
Speed of iterationSame-day changesSeveral days of waiting per round
QuantityOne to a few partsLarger batches, repeat orders
CapabilityProcesses you own and knowMetals, fine tolerances, special processes (SLS, sheet-metal, anodizing)
CostCheap consumables, owned machineExpensive machine or skill needed rarely
ConfidentialitySecret designUnder a non-disclosure agreement
LearningYou want to learn the processYou want the result, not the process

Equipment payback

Worked example: is a $600 3D printer worth it?

  • Depreciate the printer over 3 years at 500 printing hours a year: $600 ÷ 1 500 h = $0.40 per hour; add filament ($1.20 per hour), power ($0.15) and maintenance ($0.20): $1.95 per printing hour.
  • A 4-hour part costs $7.80 to print yourself, against a service price of $25 and 7 days (yours: 1 day).
  • Counting only the marginal cost (filament and power: $5.40 per part), the printer pays for itself after $600 ÷ ($25 − $5.40) = 31 parts. If you value your own time at $10 per part (30 minutes of tending at $20/h), it is 63 parts.
  • The faster iteration is often worth more than the money: a design that takes five tries is done in five days instead of five weeks.

Types of service

ServiceExamplesStrengthsWatch for
Online manufacturing platformsXometry, Protolabs, Hubs, Fictiv, JLC3DPInstant quotes, many processes, DFM feedbackPrice at small quantities; lead times; shipping
Local machine shops and fabricatorsMachine shops, sheet-metal and laser shopsTalk to a person; quick turnaround; no shippingMinimum charges; set-up cost
Makerspaces and university labsShared workshopsMachines and advice; low costWaiting lists; skills needed
PCB fabrication and assemblySee PCB PrototypingCheap boards and assemblyLead time, parts availability
Casting, molding and finishingUrethane casting, anodizing, painting, platingProduction-like parts and finishesMaster models and molds; minimum quantities
Contract engineers and designersConsultants, freelancersSkills you lack; flexibleScope, cost and who owns the result
Contract manufacturersAssembly and product manufacturersProduction runsMinimum quantities; qualification (see From Prototype to Production)

Names are examples only: services change. Check current capabilities, prices and reviews before you choose.

Asking for a quote

  • Send a complete package: a 3D model (STEP), a drawing with the critical dimensions and tolerances (see GD&T), the material and grade, the finish, the quantity and the date you need it.
  • State what matters: mark the dimensions that must be held and leave the rest at the standard tolerance; tight tolerances everywhere cost money (see Tolerances by Process and Surface Finish).
  • Ask for several quantities (1, 10, 100) to see the price breaks.
  • Ask what is included: set-up, tooling, finishing, inspection report, packaging, shipping and tax.
  • Ask for a design review (DFM feedback): a good supplier tells you what could be cheaper to make.
  • Confirm the lead time in working days and whether it starts from your approval or your payment.

Worked example: price breaks for a machined bracket

With the illustrative CNC model of Rapid Fabrication: Choosing a Method ($120 set-up, $28 per part):

QuantityTotalPer part
1$148$148.00
5$260$52.00
25$820$32.80
100$2 920$29.20

The set-up is spread over more parts: five parts cost 1.8 times one, not five times. Ask for the break at 10 or 25 and order the spares at the same time.

Comparing suppliers

Worked example: scoring three suppliers

Weights: price 0.30, lead time 0.25, quality 0.30, communication 0.15; scores 1 to 5.

SupplierPriceLead timeQualityCommunicationWeighted score
Supplier A (cheap, overseas)52323.20
Supplier B (local shop)35454.10
Supplier C (online service)44433.85

The cheapest supplier (A) scores lowest overall because of its lead time and communication; the local shop (B) wins. As with any matrix, choose the weights before you score, and check how the result changes if you shift them (see Rapid Fabrication: Choosing a Method).

  • Test a new supplier with a small order before a big one.
  • Keep a second supplier for anything important.
  • Check certification where it matters (ISO 9001, material certificates, RoHS).

Protecting your design

  • Keep dated records: notebooks, CAD file history and emails show when you made the design.
  • Use a non-disclosure agreement (NDA) before sharing the details with a supplier, investor or consultant; most platforms have terms that cover uploaded files, so read them.
  • Know what you can and cannot protect: patents (new, non-obvious inventions), copyright (software, drawings), designs and trademarks. Public disclosure (a website, a trade show) can prevent patenting in many countries.
  • Talk to a patent attorney early if you may want a patent.
  • Agree who owns the result when a contractor or a student helps: in writing.
  • Split the work if a supplier should not see everything: one makes the case, another the board.

This is general information, not legal advice: the rules differ by country and by situation.

Incoming inspection

Check what you receive before you build on it. A sample inspection with zero allowed defects can show that the defect rate is below a limit.

Worked example: how many parts to inspect?

  • To be 95 % sure that the defect rate is below 5 %, inspect n = ln 0.05 ÷ ln 0.95 = 59 parts with no defect found; below 10 %: 29; below 2 %: 149.
  • For small prototype orders (five parts) inspect all of them; for large ones sample.
Defect rate limitConfidenceParts to inspect (zero defects)
10 %95 %29
5 %95 %59
2 %95 %149
10 %90 %22
  • Check the critical dimensions, the finish and the material certificate against the drawing.
  • Keep the first articles as references and record the results.
  • Report problems promptly with photographs and measurements.

Lead time and logistics

Worked example: ordering a machined part

  • Request and receive quotes 3 d, Approve and order 1 d, Manufacture (service) 7 d, Shipping 4 d, Incoming inspection 1 d: 16 working days from the first request to a checked part.
  • Parts and shipping: $200 of parts plus $45 shipping and 8 % duty on the total is $265 landed: 32 % above the part price.
  • An overseas price quoted in another currency can move by 5 % or more between quote and payment.
  • Order before you need it: add a week for the unexpected.
  • Check the import rules and duties for the country; some processes (and materials) need export paperwork.
  • Use tracked shipping for anything important and insure the parcel.
  • Check the parts on arrival and keep the packaging until you have.

Troubleshooting

ProblemLikely causeTry
Parts arrive wrong or out of toleranceUnclear drawing; a supplier errorMark critical dimensions; ask for an inspection report; use the supplier’s remake policy
Quote much higher than expectedTight tolerances, hard material, set-up for one partRelax tolerances; ask for a DFM review; order more
Late deliveryQueue, shipping, customsConfirm dates; track; keep a local backup
Supplier will not sign an NDAPlatform termsRead the terms; split the design; use a local shop
Hard to repeat an orderNo records of the specificationKeep the drawing revision, the quote and the part numbers

Related

FAQ

When is it worth buying a 3D printer instead of using a service?

When you expect to print dozens of parts and value the speed of iteration: the payback is typically 30 to 60 parts. For a few parts, a service is cheaper.

How do I get the best price for a machined part?

Relax tolerances where they are not needed, choose a standard material and finish, order several at once and ask for a design review.

Do I need an NDA?

Before sharing a design that matters, with a supplier or consultant who is not covered by the platform’s terms. It is a sensible habit, not a guarantee.

How many parts should I inspect?

All of a small order; for larger ones, about 59 with no defects shows a rate below 5 % at 95 % confidence.

Should I use an overseas supplier?

For price at volume and when time allows. For prototypes, a local or online service with short lead times is often better.

References

  • Ulrich, K. T. and Eppinger, S. D., Product Design and Development, McGraw-Hill (make-or-buy, supplier selection).
  • Platform and supplier terms of service (confidentiality); national patent office guidance (WIPO, USPTO, UKIPO).
  • Kalpakjian, S. and Schmid, S., Manufacturing Engineering and Technology (process capabilities and costs).

Last reviewed: October 2026. Prices, lead times and legal points are general: check your own situation and get advice where it matters.