Gravel Calculator
Find how much gravel, crushed stone, sand or topsoil you need to cover an area to a depth, in cubic yards, cubic meters and tons.
How it works
Enter the length, width and depth of the area. The gravel calculator gives the volume in cubic yards and cubic meters and the weight in tons, using a typical bulk density for the material you choose, plus a compaction allowance.
Volume = L × W × depth × (1 + allowance)
Weight = volume × bulk density
| Symbol | Meaning | Unit |
|---|---|---|
| L, W | Length and width of the area | ft or m |
| depth | Thickness of the layer | in or mm |
| ρ | Bulk density of the material (loose) | kg/m³ |
| allowance | Extra for compaction and spillage, typically 5 to 15 percent | % |
Typical loose bulk densities used here: pea gravel 1,680 kg/m³ (1.4 short tons per yd³), crushed stone 1,600 kg/m³ (1.35 tons per yd³), road base 1,780 kg/m³ (1.5), sand 1,600 kg/m³ (1.35) and topsoil 1,330 kg/m³ (1.1). Real density varies with the stone, moisture and supplier: ask for the weight per cubic yard. A driveway base is usually 4 to 6 inches of crushed stone; a path or patio base 2 to 4 inches.
Related: Mulch Calculator, Concrete Calculator.
Worked example
A 20 ft × 10 ft path, 4 in deep, of pea gravel: 20 × 10 × (4 ÷ 12) = 66.7 ft³ = 2.47 yd³. With a 10 percent allowance order 2.72 yd³, which weighs about 3.85 short tons (3,489 kg).
A small dump truck carries 5 to 10 yd³; a pickup 1 to 2 yd³ (watch the payload: 1 yd³ of gravel is about 1.4 tons).
Things to know
Convert the depth to the same unit as the area: 4 inches is one third of a foot. The calculator does it with the unit boxes.
Suppliers sell by the ton or by the cubic yard; the tons shown use typical densities and move a little with moisture and stone type.
Compacted base is about 10 to 20 percent less than the delivered volume, which is why an allowance is added.
Another worked example: a driveway base
A driveway 40 ft long and 12 ft wide gets a 6 in base of crushed stone. The volume is 40 × 12 × 0.5 = 240 ft³, and 240 ÷ 27 = 8.89 yd³. With a 10 percent allowance for compaction, order 9.78 yd³.
At the typical 1 600 kg/m³ for crushed stone that is 11,961 kg, or about 13.2 short tons. That is more than one load for many small dump trucks, so ask the supplier how much one truck carries before you plan the delivery.
How much area gravel covers
Coverage for crushed stone at the typical loose density used above (1 600 kg/m³).
| Depth | One short ton covers | One cubic yard covers | One cubic meter covers |
|---|---|---|---|
| 2 in (51 mm) | 120 ft² | 162 ft² | 19.7 m² |
| 3 in (76 mm) | 80 ft² | 108 ft² | 13.1 m² |
| 4 in (102 mm) | 60 ft² | 81 ft² | 9.8 m² |
| 6 in (152 mm) | 40 ft² | 54 ft² | 6.6 m² |
Heavier materials such as road base cover a little less per ton; lighter ones such as topsoil cover more. Coverage per cubic yard does not depend on the material.
Common mistakes
- Leaving the depth in inches. 4 in is 0.333 ft. Multiplying by 4 gives twelve times too much.
- Mixing up tons. A US short ton is 2 000 lb (907 kg); a metric tonne is 1 000 kg (2 205 lb). Check which one the supplier quotes.
- Forgetting compaction. A layer rolled or plate-compacted to 4 in needs more than 4 in of loose stone.
- Using one density for everything. Sand, pea gravel and road base differ by 10 percent or more, and wet material is heavier still.
Common questions
How do you calculate how much gravel you need?
Multiply length × width × depth (all in feet) to get cubic feet, divide by 27 for cubic yards, and add 10 percent for compaction.
How many tons are in a cubic yard of gravel?
About 1.35 to 1.5 short tons depending on the stone and moisture (2,700 to 3,000 lb).
How deep should a gravel driveway be?
Typically 4 to 6 inches of compacted crushed stone over a prepared subgrade; a heavier base may need 8 inches or more.
How many square feet does a yard of gravel cover?
At 2 inches deep about 162 ft², at 3 inches 108 ft², at 4 inches 81 ft² per cubic yard.
What size of gravel should I use for a driveway?
A common build-up is a base of larger crushed stone (roughly 1½ to 2½ in), topped with ¾ in crushed stone or a crusher-run mix that packs tight. Rounded pea gravel rolls underfoot and under tires, so it suits paths and drainage better than driveways. Local soil and climate change the best choice, so ask a local supplier.
Is a ton the same as a tonne?
No. A US short ton is 2 000 lb (907 kg) and a metric tonne is 1 000 kg (2 205 lb), about 10 percent more. This calculator shows short tons and kilograms.
Should I order gravel by weight or by volume?
Use whichever unit the supplier sells in. Volume is what you actually need to fill the space; weight is what the scale at the quarry measures. Converting between them needs the bulk density, which the supplier can give you.
Sources
- Typical bulk densities from aggregate supplier data sheets; verify with your supplier.
- National Stone, Sand & Gravel Association: aggregate quantities.
Last reviewed: November 10, 2026